Fellowship Alliance Chapel

  •  

This 69,000-square-foot religious facility was constructed in nine months using the site cast tilt-up construction method. One of the biggest challenges of the project was the 156-foot clear span from the back of the sanctuary to the altar. To accommodate the desired height of the sanctuary, the team created 61-foot tall panels. The facility also contains a cantilevered balcony and a stepped-down floor in the sanctuary, which was challenging to construct on a tilt-up building. Multiple gable roofs and dormers with roof slopes of 4:12 created panel forming challenges, especially for several angled panels. Due to the wide window openings, many panels had to be stitched together prior to cutting temporary legs cast with the panels.

Client
Bedrock Concrete Corporation
Location
Medford, NJ
Medline (Richmond Hill, GA)

Medline (Richmond Hill, GA)

LJB provided structural design, equipment installation and tenant build-out for this…
Bridgeway Station Block A

Bridgeway Station Block A

Bridgeway Station Block A is a mixed-use building that features 37,000…
Princeton Road Bridge Replacement

Princeton Road Bridge Replacement

This bridge replacement project required unique design and collaboration to not…