Pioneer Medical Building at Urban Plains

Despite building through North Dakota winter conditions on a complete greenfield site, this 40,000-square-foot concrete tilt-up medical office building was completed in only eight months from design to occupancy.

Since this was the first building constructed on a complete greenfield site, construction crews had to work around installation of utilties, roads and infrastructure.

The architecturally appealing facility features a two-story glass curtain wall set at an angle, recessed window openings, unique rustication, conventional brick accents and tinted glass. An accelerated construction schedule required that the project break ground in late fall, prior to frost conditions and proved that tilt-up can be uzed in all weather conditions.

To assist the developers in creating a “green” development, this project incorporated sustainable principles that in becoming LEED-NC registered. The building was sited to optimize sunlight and a geothermal heating and cooling system increased thermal efficiency.

 

Client
Construction Engineers Ltd
Location
Fargo, ND

Related Projects

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…