Projects Filter by Service All Civil/Site Engineering Environment + Health Geospatial / Survey Safety / Fall Protection Structural Engineering Training Transportation Water Resources Filter by Market All Commercial Education Federal Health care Industrial / Manufacturing State + Local Government Search Featured Projects Florida International University Wellness & Recreation Center U.S. Route 68 (Detroit Street), U.S. Route 42 (West Main Street), and West Main Street Safety and Pedestrian Improvements LJB provided structural design for this two-story, 39,200-square-foot commercial building that’s constructed of tilt-up concrete... 24 Hour Fitness 48ROCK is the headquarters for Ayars & Ayars and its corporate partner Archi+Etc. The 20,000-square-foot... 48ROCK This three-story, 75,000-square-foot commercial office building is located within a mixed-use environment at the University... 5801 University Research Center This new two-story 88,000-square-foot fitness facility at Fort Stewart includes a gymnasium and natatorium, aerobic... 5th BCT Physical Fitness Facility This family-owned grocery store and garden center was built using insulated tilt-up concrete wall panels.... Adams Fairacre Farms The Adams Street Bridge, originally built in 1913, had significant deterioration and did not meet... Adams Street Bridge Replacement At this LEED Gold certified innovative entrepreneurial learning center for business executives and emerging entrepreneurs,... Aileron Campus Development The project consisted of the construction of a four-story sortation facility of approximately 2.6 million... Amazon Fulfillment Center Beautiful use of color and lines make this 30,300 square-foot fitness education center stand out... Aquinas Institute After identifying and prioritizing fall hazards based on probability and severity, LJB Inc. worked with... Area-wide Fall Hazard Abatement Projects This luxury auto dealership was designed to include showrooms, as well as meeting and storage... Aristocrat Motors LJB designed the layout of this 162-acre sports complex including the entrance into the complex,... Athletes in Action Sports Complex ATK needed to consolidate three operations and 13 business units under one room from five... ATK Research Center This medical office facility was open and occupied less than one year from ground breaking,... Aurora Medical Center LJB designed this new interchange on Interstate 75. The project included a new diamond interchange,... Austin Boulevard Interchange LJB produced both the structural design and steel fabrication drawings for this $8 million, three-story,... Bachelor Enlisted Quarters In 2016, Bass Lake overtopped the emergency spillway during the flooding caused by Hurricane Matthew.... Bass Lake Channel Repair LJB provided structural engineering services for four, single-story warehouse buildings in this business park, including... Bay Area Business Park LJB provided structural design for the building shell of this new corporate office for The... Beck Office Building This 15,000-square-foot office building was constructed using insulated tilt-up concrete wall panels. The new facility... Bedrock Concrete Corporate Headquarters When flood waters caused the North Belleview Road culverts to wash out completely, LJB developed... Belleview Road Emergency Culvert Replacement LJB provided structural design of the shell and core for this three-story, class A office... Blue Cross Blue Shield This architectural tilt-up building was designed to resemble a Tuscan village, and features half retail... Briarcliff Village When Buhler Chrysler wanted to build a new dealership in Hazlet, New Jersey, they wanted... Buhler Chrysler This multi-story, Class A office building – the first in the Lee’s Summit community –... Business Exchange The tranquil setting of this winery property was marred when the failure of the lake's... Caesar Creek Vineyards – Lake and Dam Repairs This office building is the home of Canadian Bank Note, a company that designs and... Canadian Bank Note The purpose of this project was to improve the safety at the intersection of East... Central Avenue & Cedar Street Intersection Improvements LJB replaced and upgraded the traffic signal system and installed ADA compliant pedestrian curb ramps... Central Avenue/East Dixie Drive Signal System Replacement LJB provided structural engineering for this single-story, medical office building for the Veterans Administration (VA).... Charlotte Hall Community-Based Outpatient Clinic This project improves the Commercial Street Corridor and the Commercial and Garnsey Street intersection by... Commercial Street Corridor Bike Route Neighborhood Connection This project widened 3,900 feet of County Road 25A with a center turn lane, new... County Road 25A Phase III Reconstruction At more than 4 million square feet, this facility is the world's largest tilt-up concrete building,... Daikin Industries – Goodman Manufacturing Operations This office provides new space for 60 employees and accommodates future company expansion. The 20,000-square-foot,... Data Systems & Technology LJB provided structural design for the $47.5-million expansion of The Dayton Children’s Hospital at its... Dayton Children’s Hospital Expansion This 128,000-square-foot facility allows for nine different medical installations at Ft. Detrick to be consolidated... Defense Medical Logistics Center LJB served as a subconsultant to the Miller Valentine Group for the structural design of... Domino’s Supply Chain Center This new facility combined three existing operations into one building. With more than 146,000 square... Donnewald Distributing The purpose of the study was to develop a preferred transportation plan that would balance... Downtown Business District Transportation Study A school district in Ontario, Canada, needed a new school on an extremely tight schedule. By using... École Élémentaire Publique Des Sentiers This three-story, Class A medical office building was constructed from load-bearing concrete tilt-up wall panels.... EMH Sheffield Medical Office Building The two-story 17,755-square-foot new battalion headquarters is the home of the 52nd Engineer Battalion at... EN Battalion Headquarters South This two-story, 134,500-square-foot comprehensive archive/biorepository services storage facility in Leesburg, Virginia, is divided into two... EPL Airport Commerce Park Development This project constructed a 0.75-mile multi-use path that connects the existing bike path at State... Fairborn Bikeway Connector The expansion of the Timber Ridge subdivision required new public utilities, including water. The multi-discipline... Fairview Drive and Union Road Intersection Reconstruction and Water Main Extension Created by the merger of Maryland-based Bon Secours and Cincinnati-based Mercy Health in 2018, Bon... Fall Hazard Risk Assessments for Bon Secours Mercy Health LJB began providing fall protection consultation for this government entity several years ago, with an... Fall Protection Consultation The extreme, high heat environment within any melt shop in the steel industry requires all... Fall Protection Design for a Melt Shop Charge Crane At the city’s wastewater treatment plant, workers faced fall hazards of up to 65 feet,... Fall Protection Design for Wastewater Treatment Plant In this large-scale project, LJB performed a roof fall hazard identification audit of 30 buildings... Fall Protection Evaluation & Abatement Originally construction in 1972, this bridge was structurally deficient. The 600-foot existing bridge had side-mounted... Farmersville-West Carrollton Road Bridge Rehabilitation over the Great Miami River This office and distribution facility, which is located within a few miles of the airport... FedEx Ground Distribution Center This $5 million sorting and distribution facility for FedEx Ground was challenged by a tight... FedEx Ground Sorting & Distribution Facility This 69,000-square-foot religious facility was constructed in nine months using the site cast tilt-up construction... Fellowship Alliance Chapel When Hamilton Township was investigating a new fire station location, LJB provided GIS mapping and... Fire Route Mapping & Analysis The Florham Park Sports Dome and Event Center is an indoor complex that houses everything... Florham Park Sports Dome LJB provided structural design for this $25 million expansion of FIU’s Wellness & Recreation Center,... Florida International University Wellness & Recreation Center This 36,000-square-foot retail facility provides a larger, more updated space for a Harley-Davidson dealership near... Gail’s Harley-Davidson This facility for outdoor outfitter and sporting goods retailer Gander Mountain was constructed on an... Gander Mountain Retail Store GE Inspection Technologies needed to expand their testing and manufacturing facility as well as add... GE Inspection Technologies The regional bikeway system in the Greater Dayton area is a popular outdoor destination. However,... Great Miami River Recreational Trail and Bikeway Located in the heart of North Carolina, the 1,500-acre site was selected due to its... Greensboro-Randolph Megasite This 18,000-square-foot picturesque office building was built for an insurance provider in Kemptville, Ontario. The... Grenville Mutual Insurance This state-of-the-art Honda dealership needed a clean, striking exterior to attract car buyers to the... Hackettstown Honda As one of the first school projects in Virginia to use tilt-up, the construction of... Harrisonburg Combined Schools Gymnasium Addition The Hershey Midwest Distribution Center is a 1.1-million-square-foot warehouse facility that must maintain a temperature... Hershey Midwest Distribution Center This Hitachi expansion added 200,000 square feet of warehouse with 20 dock bays and office... Hitachi International Distribution Center Addition LJB performed evaluations and improvements on six parking lots at Husky Energy Corporation. LJB's team... Husky Parking Lot Improvements Porter Beach, on the Indiana Dunes National Lakeshore, is a popular public beach on Lake... Indiana Dunes – Porter Beach Access Environmental Assessment LJB provided structural design and drafting of this five-story class A office building in Centennial,... Inova Dry Creek II Interstate 275 from Winton Road to U.S. 42 is one of the most heavily traveled... Interstate 275 Widening The Brent Spence Bridge carries Interstate 75 over the Ohio River from downtown Cincinnati, Ohio,... Interstate 75 Right-of-Way Plans and Acquisition for the Brent Spence Bridge Replacement This project included five noise wall sites in select primarily residential areas along an approximately... Interstate 80 Noise Wall Analysis and Construction This project involves the complete replacement and widening of two pairs of bridges: Interstate 90... Interstate 90 Bridge Replacements Because the previous plan was outdated, the Kaibab Plateau - North Rim Parkway, which is... Kaibab National Forest Scenic Byway Corridor Management Plan Katy Ranch Crossing is the first phase of a two-building office development located west of... Katy Ranch Crossing LJB designed the improvement and widening of a major arterial roadway that services recreation-oriented properties,... Kings Island Drive Widening and Improvements This 387,000-square-foot tilt-up structure added needed space for Kraft’s Capri Sun production line. The addition... Kraft Foods Facility Addition This auto dealership was built with the tilt-up construction method and includes a showroom, parts... Lee’s Summit Subaru Linn Energy wanted to create a new office space that would attract talent to the... Linn Energy By unanimous vote, Ohio’s Loveland City school board selected LJB Inc. to guide the Loveland... Loveland Pandemic Planning The lake at Lumbee Tribe of North Carolina’s Cultural Center is an integral part of... Lumbee Tribe of NC Cultural Center Dam Repair When land negotiations for a new charter school were delayed more than three months, opening... Manatee Charter School This new state-of-the-art casting facility allowed a global automotive parts supplier based in Seoul, South... Mando LJB provided civil design services for the 36,000-square-foot new reserve center and vehicle maintenance facility... Marine Corps Reserve Center and Vehicle Maintenance Facility The Marine Corps Support Facility in New Orleans is the national headquarters for the Marine... Marine Corps Support Facility To live out their mission, the Lorain County Metro Parks wanted a new facility that... Mercy Health and Recreation Center This project provides additional classroom space for the Minnesota School of Business. The two-story facility... Minnesota School of Business This project included two buildings, one 30,000 square feet, the other 20,000 square feet. The... Monsanto Texas Cotton Breeding and Technology Center LJB Inc. provided the structural design for Mosaic's new Florida Operations Center in Lithia, Florida.... Mosaic Office Building After providing comprehensive fall protection training for selected staff working at NASA’s Glenn Research Center,... NASA Glenn Research Center Fall Hazard Risk Assessment This facility is home to the National Cancer Institute's Advanced Technology Research Facility at Riverside... National Cancer Institute’s Advanced Technology Research Facility Traffic on National Road in the AM and PM peak periods caused queuing adjacent to... National Road Widening This limited services contract allows the NCDOT to supplement their limited resources with well-trained personnel... NCDOT Express Feasibility Studies This building, with 500,000 square feet of retail space and 250,000 square feet of warehouse... Nebraska Furniture Mart LJB provided structural design for the Nestle Waters Bottling Plant. The project achieved a LEED... Nestle Waters Bottling Facility The Newtown Youth Academy is an 86,000-square-foot sports facility that features a soccer field, basketball... Newtown Youth Academy A new 110,000-square-foot medical office building was constructed with tilt-up concrete wall panels. The $17.5... Northern Ohio Medical Facility (NOMS) Located in an industrial park consisting of small metal building manufacturing facilities, the project owners... Northwest Logistics Center The project included furnishing and installing approximately 16,200 feet of 12-inch ductile iron water main,... Northwest Montgomery County Water This 350,000-square-foot office/warehouse was the corporate headquarters and manufacturing facility for O-Cedar Brands, Inc. The... O’Cedar Brands Warehouse At nearly 675,000 square feet, this cross-dock tilt-wall distribution center in Katy, Texas, has a... Oakmont West 10 As the Ohio Department of Transportation’s statewide safety design consultant in 2019, LJB developed Ohio’s... ODOT Pedestrian Safety Improvement Program LJB has been completing environmental assessments (called Environmental Review Records under HUD NEPA regulations) for... OHFA Environmental Review Records LJB, as a subconsultant to EnviroScience, Inc. is providing state and/or federal threatened and endangered... Ohio Statewide Ecological Resources Surveys This 98,000-square-foot facility features a two-story academic wing and a lower level athletic wing that... Olathe Junior High #9 Olathe Pointe is a 390,000-square-foot suburban village including retail, restaurant and entertainment offerings. The design-build... Olathe Pointe As part of a design-build team, LJB provided structural services for this 100,000-square-foot, five-story medical... Ollie Davis Medical Pavilion LJB provided structural engineering and tilt-up panel detailing on this project for a GSA tenant. ... One Town Center The Rinker Sports Center concept was originally designed as a conventional structural system of CMU... Palm Beach Atlantic University (PBAU) Rinker Sports Center LJB provided structural design for this 162,000-square-foot Class A industrial building, which features a 32-foot... Palmetto Trade Center This 52,000-square-foot auto dealership near Cleveland, Ohio, features a service area, lube bay and large... Pat O’Brien Medina LJB provided architectural, structural and site design services for the creation of the sophisticated Pentagon... Pentagon Park Development & CSC Office Building As part of a three-phase design-build project to create new housing at Fort Leonard Wood... Permanent Party Barracks – Phases I, II and III With Motiva Enterprises near New Orleans serving as the host organization, LJB conducted a competent... Petrochemical Industry Competent Person Fall Protection Training Despite building through North Dakota winter conditions on a complete greenfield site, this 40,000-square-foot concrete... Pioneer Medical Building at Urban Plains LJB performed a fall hazard risk assessment for Portland Community College across several campuses, which... Portland Community College Roof Fall Hazard Risk Assessment When InterChange, a warehousing, logistics and development company, needed a new warehouse time was of... Premier Flex Warehouse I and II This 1.7 million-square-foot distribution center was constructed with concrete tilt-up construction. The massive building encompasses... Procter & Gamble Distribution Center LJB provided structural design for the Redi Carpet Headquarters, which includes 45,000 square feet of... Redi Carpet The purpose of ODOT's MS4 inventory was to map ODOT'S storm water drainage system so... Regional MS4 Stormwater Outfall In this project administered by six public entities, LJB was responsible for street, riverfront and... RiverScape MetroPark This striking new Class A office building is four stories and more than 126,000 square... Riverside 5 Office Building LJB worked with the City of Fairfield to improve both the flow of traffic and... S.R. 4 and South Gilmore Road-Holden Blvd. Sustainable Intersection Improvements (Greenroads Certified) This two-story academic building was part of a campus upgrade project for the Brevard County... Satellite High School Replacement This build-to-suit office and warehouse facility near Savannah, Georgia, totals more than 520,000 square feet,... Savannah Crossgate 520 The City of Wilmington selected LJB to provide engineering design services for Shipyard Boulevard (U.S.... Shipyard Boulevard Bus Pullout and Sidewalk Improvement (NCDOT U-5534N) Eye-catching facilities like the Shops at Marcus Dairy exemplify how architectural innovation and aesthetic beauty... Shops at Marcus Dairy At six stories, Sierra Pines II is the tallest building constructed with load-bearing tilt-up concrete... Sierra Pines II LJB provided tilt-up wall panel engineering for this 48,000-square-foot building that includes manufacturing space and... Sintavia at Port 95 LJB provided architecture, as well as civil, structural, environmental and traffic engineering for this 80,000-square-foot... Southview Hospital Physicians Building Severe bank erosion along the stream at Spring Park in Winston-Salem, North Carolina, was threatening... Spring Park Drainage Improvements This new facility for SRI International houses research a new research laboratory and office building.... SRI International – Harrisonburg The 29,000-square-foot addition to St. Anthony High School created a secure entrance, with more classroom... St. Anthony High School This 29,000-square-foot religious facility provides classical reverent space, while showcasing an innovative application for tilt-up... St. Clare Catholic Church This new 25,000-square-foot church building includes a large worship area, as well as a fellowship... St. Thomas Catholic Church LJB Inc. designed this new bridge underpass to enable Fairborn Cement Company to extend its... State Route 235 over Cemex Haul Road Underpass Bridge The project widens the intersection of the Bypass and Port Union Road by adding additional... State Route 4 Bypass Widening As part of a general engineering services task order contract, LJB designed the joint replacement... State Route 444 Bridge Rehabilitation over Mad River LJB designed mast arm traffic signal supports that are of a style compatible with recent... State Route 741 and Innovation Drive Traffic Signal Design For this unique pilot project, LJB designed the replacement of two prestressed concrete box beam... State Route 799 Conventional and Composite Bridge Replacements Through a statewide safety study contract, LJB was asked to provide safety improvement recommendations for... Statewide Safety Studies LJB monitored stream mitigation and created a Mitigation Monitoring Report to document the results of... Stream Mitigation Monitoring for West Perimeter Road LJB was selected for this emergency project to replace the deficient, single-span prestressed concrete box... Stroop Road Bridge Tilt-up construction delivered attractiveness, functionality and flexibility for this religious, educational and social venue. A... Temple Dor Dorim The owner of this project needed a durable facility that could withstand hurricane winds without... The Spot/Spirits Unlimited LJB provided structural engineering services for this new 270,000-square-foot facility. The building contains a 45,000-square-foot... Thorne Research Despite being constructed during the winter, this tilt-up church project beat the original schedule by... Timothy Lutheran Church Despite significant site challenges and a massive footprint, this project demanded a 10-month schedule. The... TJX Corporation When the new Springfield Regional Medical Center opened at Plum and North Streets in downtown... U.S. Route 40 (North Street) Realignment This project included multiple studies, innovative drainage treatment, and roadway and traffic signal design that... U.S. Route 40 West Broad Street Corridor Improvements The lack of dedicated bicycle infrastructure and way-finding signage for cyclists on Detroit Street created... U.S. Route 68 (Detroit Street), U.S. Route 42 (West Main Street), and West Main Street Safety and Pedestrian Improvements When the University of Dayton needed to build additional housing for its growing student body,... University of Dayton – Caldwell Street Student Housing LJB provided structural design services for this 165-student apartment building in the University of Dayton... University of Dayton – Lawnview Apartments LJB prepared the environmental assessment (EA) for the removal and replacement of a stand of... Vanderbilt Mansion Conifer Barrier Environmental Assessment This 221,000-square-foot, four-story office building was constructed with concrete tilt-up wall panels, including interior walls... Verizon Orlando LJB provided structural engineering on a three-story class A office building using tilt-up concrete construction.... Veteran’s Affairs Office Building This 32,000-square-foot athletic center provides recreational space for Villa Walsh High School, an all-girls Catholic... Villa Walsh The Village of Yellow Springs needed an updated GIS solution to support its Public Works... Village GIS Interface Development LJB provided both civil and structural engineering for this project, which adds functional space to... Walgreens Distribution Center Addition The City of Miamisburg's Department of Public Works needed a modern Geographic Information System (GIS)... Water Asset Management – Web GIS Implementation With more than 300,000 square feet of office space on three floors, this Class-A office... Wells Fargo Home Mortgage Headquarters LJB prepared an Environmental Impact Statement (EIS) that assessed the impacts that may result from... WPAFB Entry Gate Control Environmental Assessment This 60,000-square-foot studio for the ABC affiliate in Miami is constructed of concrete tilt-up wall... WPLG TV This project constructed a new 500-foot pedestrian bridge over Interstate 675 connecting the cities of... Wright State Way Pedestrian Bridge over Interstate 675 The urban trees at WPAFB provide numerous environmental benefits including reduction of air pollutants, energy... Wright-Patterson Air Force Base Urban Tree Inventory and Assessment To increase capacity between Austin Boulevard and Spring Valley Pike, this project studied the reconstruction... Yankee Street Improvements The City of Sidney selected LJB Inc. and DAB Designs to begin the design and... Zenas King Historic Truss Bridge Rehabilitation in Tawawa Park Zona Rosa is an urban town center that provides shopping, dining and entertainment venues in... Zona Rosa Shopping Center