This 1.2 million-square-foot light industrial building was originally designed by an engineer who had limited experience with the tilt-up concrete method. LJB’s expertise with this construction method and deep understanding of its construction allowed us to redesign this facility much more efficiently by value engineering the project. LJB’s updated design used a composite wall system that minimized both the concrete and steel needed for the wall panels. This more efficient design saved the contractor $400,000 in material costs.
Client
Pepper Construction, VanTrust Real Estate & Red Architecture
Pepper Construction, VanTrust Real Estate & Red Architecture
Location
Lockbourne, Ohio
Lockbourne, Ohio
Related Industrial / Manufacturing Projects
Medline
LJB provided structural design, equipment installation and tenant build-out for this…
Exchange Logistics Buildings
LJB provided structural design for these three warehouses, which provide nearly…
Stream-Windfern
LJB provided structural design for this new single-story, front loaded, speculative…