North Lake II, Building D

LJB provided the structural design for this 202,000-square-foot rear-loaded warehouse with a 32-foot clear height. The building consists of conventional structural steel with perimeter load-bearing tilt-up concrete. The building has tenant entrances at each corner on the front elevations with dock doors and drive-in doors along the rear elevations.

Client
Matan Companies
Location
Ashland, VA

Related Projects

Morrison Bridge Rehabilitation

Morrison Bridge Rehabilitation

In 1874, the Morrison brothers built a cast-and-wrought-iron bowstring arch bridge…
Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…