Stream Mitigation Monitoring for West Perimeter Road

LJB monitored stream mitigation and created a Mitigation Monitoring Report to document the results of impacts that occurred due to a culvert extension at the Dayton International Airport, which impacted a total of 1,575 linear feet of stream.

The stream mitigation has been implemented at Englewood MetroPark, a Five Rivers MetroParks property on River Road, approximately three miles west of the impact site. The enhancements included 2.7 acres of invasive species removal and 4.1 acres of reforestation.

The mitigation included monitoring vegetation, assessing stream stability, and physical and chemical removal of invasive species (e.g., honeysuckle).

Client
City of Dayton
Location
Dayton, OH

More Projects

West Airway Road Corridor Reconstruction

West Airway Road Corridor Reconstruction

On this project, LJB addressed traffic safety concerns and designed improvements…
All Aboard Florida New In-line Rail Stations

All Aboard Florida New In-line Rail Stations

LJB performed the structural engineering and shop drawing detailing for these…
McKaig Road Reconstruction, Phases 2-4

McKaig Road Reconstruction, Phases 2-4

These roadway improvement projects enhanced the safety and condition of McKaig…