Linn Energy

Linn Energy wanted to create a new office space that would attract talent to the growing gas corporation. The architect chose tilt-up concrete construction to reduce project costs and shorten the delivery schedule. The resulting dynamic four-story, 110,000-square-foot structure was delivered ahead of schedule and within budget.

To create large glazed openings, a series of spandrel panels were used between full height panels.  Corner spandrels were suspended from full-height framing and structural steel columns to accomplish the fully-glazed corners desired. Tilt-up panels were also used on the stair cores to augment the shear walls on the exterior perimeter.

Client
Wakefield Beasley & Associates
Location
Oklahoma City, OK

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…