For Burlington Northern Santa Fe (BNSF) Railway, LJB provided a site survey and hydrologic and...
Norfolk Southern Culvert CD-279.76
LJB provided Norfolk Southern Railway with a site survey, hydrologic and hydraulic analysis, as well...
Frederick Airport Park – Phase I
Frederick Airport Park Phase I added more than 515,000 square feet of industrial and logistics...
I-76 Trade Center, Building B
I-76 Trade Center Building B transformed the traditional warehouse model by combining large-scale logistics performance...
Westside Purple Line Extension, Phase 3: Rail Transit Line
Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction Cost: $1.27 Billion Technology:...
Montreal Airport Station, Transit Terminal for REM
Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections and Complex Fault Crossings...
Rebecca Trunk Wastewater Main
Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43 Million Technology: Drill and Blast...
Atlanta Airport Plane Train Turnback Tunnel
Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client: Ricondo Construction Cost: $140...
Crenshaw/LAX Transit Corridor
Role: SOE Design of Stations; Design Build for Contractor Client: Walsh-Shea Constructors Construction Cost: $1.27 Billion...
SwiftAir Hangar
At Dayton-Wright Brothers Airport, LJB helped bring a vision to life—a new 8,000-square-foot private airplane...
Hays Farm
LJB provided structural design services for Phase 1 of the Hays Farm Office Park, a...
Sprint Transport Headquarters
This 16-acre site serves as the headquarters for Sprint Transport, which provides bulk liquid transportation...











