North Lake II, Building D

LJB provided the structural design for this 202,000-square-foot rear-loaded warehouse with a 32-foot clear height. The building consists of conventional structural steel with perimeter load-bearing tilt-up concrete. The building has tenant entrances at each corner on the front elevations with dock doors and drive-in doors along the rear elevations.

Client
Matan Companies
Location
Ashland, VA

Related Projects

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…