Bridge Replacement over West Branch of Mahoning River

  •  

LJB designed the replacement of this existing single-span slab bridge and installation of new abutments. The replacement bridge is a new 60-foot single-span prestressed concrete box beam bridge with a composite concrete deck and reinforced concrete integral abutments on pile foundations placed behind the existing ones. All work was above the ordinary high-water mark for the stream, there were two right-of-way takes, and utility relocations were required. Associated approach roadway work included pavement replacement of approximately 25 feet at each end of the bridge and guardrail upgrades.

Client
ODOT – District 4
Location
Ravenna Township, OH

Related Projects

VA Community-Based Outpatient Clinic

VA Community-Based Outpatient Clinic

Our structural and civil teams collaborated on the design of a…
300 Redstone

300 Redstone

This new building serves as a central conference and nationwide collaboration…
Redstone Gateway 8000

Redstone Gateway 8000

LJB’s structural team designed this four-story, tilt-up concrete Class A office…