Bridge Replacement over West Branch of Mahoning River

  •  

LJB designed the replacement of this existing single-span slab bridge and installation of new abutments. The replacement bridge is a new 60-foot single-span prestressed concrete box beam bridge with a composite concrete deck and reinforced concrete integral abutments on pile foundations placed behind the existing ones. All work was above the ordinary high-water mark for the stream, there were two right-of-way takes, and utility relocations were required. Associated approach roadway work included pavement replacement of approximately 25 feet at each end of the bridge and guardrail upgrades.

Client
ODOT – District 4
Location
Ravenna Township, OH

Related Projects

Interurban Pedestrian Bridge

Interurban Pedestrian Bridge

LJB supported Chagrin Valley Engineering, LTD (CVE) in the design and…
Hancock County Bridge Replacements

Hancock County Bridge Replacements

LJB designed two cast-in-place reinforced concrete slab bridges on SR 698…
Atwood Lake Peninsula Master Plan

Atwood Lake Peninsula Master Plan

This project for the Muskingum Watershed Conservancy District involved master planning…