LJB designed the replacement of this existing single-span slab bridge and installation of new abutments. The replacement bridge is a new 60-foot single-span prestressed concrete box beam bridge with a composite concrete deck and reinforced concrete integral abutments on pile foundations placed behind the existing ones. All work was above the ordinary high-water mark for the stream, there were two right-of-way takes, and utility relocations were required. Associated approach roadway work included pavement replacement of approximately 25 feet at each end of the bridge and guardrail upgrades.
Client
ODOT – District 4
ODOT – District 4
Location
Ravenna Township, OH
Ravenna Township, OH
Related State + Local Government Projects
BNSF Railway Bridge Hydraulic Analysis
For Burlington Northern Santa Fe (BNSF) Railway, LJB provided a site…
Norfolk Southern Culvert CD-279.76
LJB provided Norfolk Southern Railway with a site survey, hydrologic and…
Frederick Airport Park – Phase I
Frederick Airport Park Phase I added more than 515,000 square feet…