Bridge Replacement over West Branch of Mahoning River

  •  

LJB designed the replacement of this existing single-span slab bridge and installation of new abutments. The replacement bridge is a new 60-foot single-span prestressed concrete box beam bridge with a composite concrete deck and reinforced concrete integral abutments on pile foundations placed behind the existing ones. All work was above the ordinary high-water mark for the stream, there were two right-of-way takes, and utility relocations were required. Associated approach roadway work included pavement replacement of approximately 25 feet at each end of the bridge and guardrail upgrades.

Client
ODOT – District 4
Location
Ravenna Township, OH

Related Projects

Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…