Dryden Road Resurfacing (MOT-CR701 Dryden-1.96)

  •  

This project included the rehabilitation of approximately 7,200 feet of Dryden Road in Moraine, Ohio. The existing roadway included five lanes of pavement consisting of concrete base with an asphalt overlay and curb with intermittent sidewalks. LJB removed curb cuts and drive aprons to vacant lots to improve the city’s ability to control access.