Hancock County Bridge Replacements

  •  

LJB designed two cast-in-place reinforced concrete slab bridges on SR 698 in Hancock County. LJB worked closely with ODOT District 1 and the Office of Geotechnical Engineering (OGE) during the structure type study to determine the most appropriate and cost-efficient structure types for the project. Our team first completed a hydraulic analysis and scour assessment for each structure during the structure type study. The first bridge was a replacement of a three-span slab bridge with another three-span slab structure. For the second bridge, a new three-span slab was used to replace the existing two-span slab and was designed in a slight horizontal curve. Both new structures utilize reinforced concrete wall type piers and abutments founded on spread footings keyed into the underlying bedrock.

Client
ODOT – District 1
Location
Lima, OH

Related Projects

Morrison Bridge Rehabilitation

Morrison Bridge Rehabilitation

In 1874, the Morrison brothers built a cast-and-wrought-iron bowstring arch bridge…
Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…