Novack Bridge Replacement

  •  

After this bridge had been closed to traffic due to structural deficiencies, LJB was contracted to provide a feasibility study for replacing the bridge with a culvert. During the initial flood study, LJB concluded that a simple span box beam bridge would be more cost efficient than the large multiple box culverts that would be required for a No-Rise Certification due to an upstream home within the FEMA floodplain. Our transportation team then proceeded with design services for the bridge replacement. The design included a new bridge on a realignment to minimize impacts to local property owners and avoid impacts to existing utilities, including an aerial sewer crossing. Additional services included hydraulics, roadway, erosion control, and traffic control.

Client
City of Winston-Salem
Location
Winston-Salem, NC

Related Projects

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…