Olentangy Augmentation Relief Sewer (OARS) Construction Management

  •  
  • Role: Construction Management, Technical Support
  • Client: City of Columbus
  • Construction Cost: $375 Million
  • Technology: EPBM/Slurry TBM
  • Geology:  Karst limestone
  • Diameter: 20 ft (6 m)
  • Length: 23,000 ft (7010 m)
  • Depth: 200 ft (50 m)
Project Elements:

  • Combined Sewer Overflow (CSO) Tunnel in urban environment
  • Deep shafts (access and drop shafts)
  • Slurry wall construction
  • Drill and blast shafts, adits, and starter tunnel
  • Groundwater inflow control by rock grouting
  • TBM data analysis
  • Risk management during construction
Client
City of Columbus
Location
Columbus, OH

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…