Ollie Davis Medical Pavilion

As part of a design-build team, LJB provided structural services for this 100,000-square-foot, five-story medical office facility. The brick clad, steel frame structure features a penthouse on the roof that houses a conference center. Although the building is separate from the adjacent hospital, a second floor pedestrian bridge provides easy access for medical professionals and staff. The owner gave the design-build team accolades for expediting the project schedule and only having two change orders on the entire project – both of which were owner initiated.

Client
Synergy Building Systems
Location
Beavercreek, OH

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…