St. Anthony High School

The 29,000-square-foot addition to St. Anthony High School created a secure entrance, with more classroom space, a 400-seat multipurpose room, and a 2,100-seat gymnasium. Tilt-up concrete construction was selected for this project due to its speed, strength and thermal properties. Wall panels were stack-cast three high, because only a minimum amount of floor space was available. The structure also includes numerous offsets and corners, as well as two elevations of embedded steel for connections of mezzanine and roof structures. To add architectural interest, the building features curved window and door openings. Brick and EIFS were used as exterior finishes.

Client
Hance, Utz and Associates, LLC
Location
Effingham, IL

Related Projects

BNSF Railway Bridge Hydraulic Analysis

BNSF Railway Bridge Hydraulic Analysis

For Burlington Northern Santa Fe (BNSF) Railway, LJB provided a site…
Norfolk Southern Culvert CD-279.76

Norfolk Southern Culvert CD-279.76

LJB provided Norfolk Southern Railway with a site survey, hydrologic and…
Frederick Airport Park – Phase I

Frederick Airport Park – Phase I

Frederick Airport Park Phase I added more than 515,000 square feet…