State Route 444 Bridge Rehabilitation over Mad River

  •  

As part of a general engineering services task order contract, LJB designed the joint replacement and deck overlay of a bridge over the Mad River. LJB developed a phased construction scheme, maintaining one lane of traffic in each direction. This project was completed on time and on budget.

 

Client
ODOT District 8
Location
Greene County, OH

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…