Olathe Junior High #9

This 98,000-square-foot facility features a two-story academic wing and a lower level athletic wing that consists of two gymnasiums and a natatorium. The original concept for the building was traditional masonry, but an option for design-build tilt-up provided a cost savings that put the project $600,000 under budget and shaved two months off the schedule.

The exterior of the wall panels are a sampling of many different architectural finishes, including multiple types of cast-in brick, curtain wall windows and a hard trowel finish.

The building features insulated and non-insulated tilt-up concrete wall panels. One of the project’s greatest challenges was achieving an acceptable finish for the interior of the tilt-up panels in the athletic wing so additional finishing was not required on the inside.

Client
Summit Concrete
Location
Olathe, KS

Related Projects

Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…