Replace Cooling Tower – Buildings 10262/10266

When an existing 2,000-ton cooling tower reached the end of its useful life, LJB provided civil and structural design for a new stainless steel cooling tower replacement to meet the demands of year-round operation. The project included removal and disposal of the existing cooling tower, isolation valves, pumps and auxiliary equipment. The new cooling tower has a support building to house chemical tanks and a perimeter screen wall. The design complied with Anti-Terrorism/Force Protection requirements.

 

Client
Wright-Patterson Air Force Base – 88th Air Base Wing
Location
Wright-Patterson AFB, Ohio

Related Projects

Empire West Building 10

Empire West Building 10

LJB provided structural engineering for Empire West Building 10, a 640,000-square-foot,…
Stateview Boulevard, Buildings 1-3

Stateview Boulevard, Buildings 1-3

LJB provided structural engineering for a three-building speculative warehouse development. The…
Westside Logistics

Westside Logistics

LJB provided structural engineering for this speculative warehouse that offers more…

    * required fields