Our team served as the prime consultant on this multimodal road and bridge project that...
Rowlett Creek CLOMR & LOMR
As part of the Pleasant Valley Road Bridge and Utility project, our team revised the...
Watson Branch Single Family Phase 2
G&A was hired by Realty Capital Management as the surveyor and engineer on the 116...
Winston Lake Greenway & Dredging
For this project to design improvements to Winston Lake, LJB was called upon to develop...
L-Line Sewer Design
LJB provided permitting and design for the replacement of approximately 4,000 lineal feet of 12-inch...
Valleyview Street & Morris Road Waterline & Stormwater Improvements
The failing storm sewer and water main were creating sinkholes and destroying pavement in the...
Caesar Creek Vineyards – Lake and Dam Repairs
The tranquil setting of this winery property was marred when the failure of the lake's...
Water Asset Management – Web GIS Implementation
The City of Miamisburg's Department of Public Works needed a modern Geographic Information System (GIS)...
Bass Lake Channel Repair
In 2016, Bass Lake overtopped the emergency spillway during the flooding caused by Hurricane Matthew....
Lumbee Tribe of NC Cultural Center Dam Repair
The lake at Lumbee Tribe of North Carolina’s Cultural Center is an integral part of...
Spring Park Drainage Improvements
Severe bank erosion along the stream at Spring Park in Winston-Salem, North Carolina, was threatening...
RiverScape MetroPark
In this project administered by six public entities, LJB was responsible for street, riverfront and...