L-Line Sewer Design

LJB provided permitting and design for the replacement of approximately 4,000 lineal feet of 12-inch...

Bass Lake Channel Repair

In 2016, Bass Lake overtopped the emergency spillway during the flooding caused by Hurricane Matthew....

RiverScape MetroPark

In this project administered by six public entities, LJB was responsible for street, riverfront and...