Pleasant Valley Road Bridge & Utilities

  •    •    •    •    •    •  

Our team served as the prime consultant on this multimodal road and bridge project that replaces a two-lane asphalt road with a four-lane divided concrete road. The design includes two 1,500-foot long bridges, two 130-foot tall City monument towers, two 60-foot tall canopy towers with overlook platforms, and 1.5 miles of trails that form part of the Six Cities Trail Plan.

We also designed related water, sanitary sewer and storm sewer improvements, as well as channel modifications that result in no increase in the Rowlett Creek floodplain elevations. In addition to civil, structural and electrical engineering, the scope of work included environmental permitting, hydraulic modeling for a CLOMR and a LOMR, topographic and property surveying, right-of-way and easement documents, as well as bidding and construction administration services.

 

Client
City of Garland, TX
Location
Garland, TX

Related Projects

BNSF Railway Bridge Hydraulic Analysis

BNSF Railway Bridge Hydraulic Analysis

For Burlington Northern Santa Fe (BNSF) Railway, LJB provided a site…
Norfolk Southern Culvert CD-279.76

Norfolk Southern Culvert CD-279.76

LJB provided Norfolk Southern Railway with a site survey, hydrologic and…
Frederick Airport Park – Phase I

Frederick Airport Park – Phase I

Frederick Airport Park Phase I added more than 515,000 square feet…