24 Hour Fitness

LJB provided structural design for this two-story, 39,200-square-foot commercial building that’s constructed of tilt-up concrete wall panels and has projecting EIFS cornice and canopy. Exterior walls feature tilt-up concrete composite insulated panels. The floor structure is concrete on deck over structural steel beam and open web steel joist framing, and the roof consists of roof deck on open web steel joists.

Tall floor-to-floor heights accommodate sports courts and other athletic activities. Roof heights vary, with the uppermost roof located above a basketball court on the second floor. The second level includes workout space. A lower-level indoor pool required unique detailing of foundations and wall panel tie-ins at the slab on grade and presented construction challenges to temporarily brace the wall panels

Client
Bedrock Concrete Corporation
Location
Springfield, NJ

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…