LJB performed the structural engineering and shop drawing detailing for these 60,000-square-foot Fort Lauderdale and West Palm Beach stations. The West Palm Beach station also connects with the neighborhood’s existing vehicular, trolley and pedestrian networks and establishes links to the Tri-Rail, Palm Tran Downtown Trolley and Amtrak West Palm Beach station. The use of tilt-up panels saved the owner a significant amount of money and construction time over the original cast-in-place concrete design by the ability to construct large sections of the concrete frames on the ground.
Client
Woodland Tilt-Up
Woodland Tilt-Up
Location
West Palm Beach & Fort Lauderdale, Florida
West Palm Beach & Fort Lauderdale, Florida
Related State + Local Government Projects
Columbus County Bridge Replacement
LJB served as the prime consultant providing engineering services in the…
Novack Bridge Replacement
After this bridge had been closed to traffic due to structural…
17th Street Sidewalk
For this project, LJB rerouted the 5-foot-wide sidewalk through the Oak…