Olentangy Augmentation Relief Sewer (OARS) Construction Management

  •  
  • Role: Construction Management, Technical Support
  • Client: City of Columbus
  • Construction Cost: $375 Million
  • Technology: EPBM/Slurry TBM
  • Geology:  Karst limestone
  • Diameter: 20 ft (6 m)
  • Length: 23,000 ft (7010 m)
  • Depth: 200 ft (50 m)
Project Elements:

  • Combined Sewer Overflow (CSO) Tunnel in urban environment
  • Deep shafts (access and drop shafts)
  • Slurry wall construction
  • Drill and blast shafts, adits, and starter tunnel
  • Groundwater inflow control by rock grouting
  • TBM data analysis
  • Risk management during construction
Client
City of Columbus
Location
Columbus, OH

Related Projects

Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…