Olentangy Augmentation Relief Sewer (OARS) Construction Management

  •  
  • Role: Construction Management, Technical Support
  • Client: City of Columbus
  • Construction Cost: $375 Million
  • Technology: EPBM/Slurry TBM
  • Geology:  Karst limestone
  • Diameter: 20 ft (6 m)
  • Length: 23,000 ft (7010 m)
  • Depth: 200 ft (50 m)
Project Elements:

  • Combined Sewer Overflow (CSO) Tunnel in urban environment
  • Deep shafts (access and drop shafts)
  • Slurry wall construction
  • Drill and blast shafts, adits, and starter tunnel
  • Groundwater inflow control by rock grouting
  • TBM data analysis
  • Risk management during construction
Client
City of Columbus
Location
Columbus, OH

Related Projects

BNSF Railway Bridge Hydraulic Analysis

BNSF Railway Bridge Hydraulic Analysis

For Burlington Northern Santa Fe (BNSF) Railway, LJB provided a site…
Norfolk Southern Culvert CD-279.76

Norfolk Southern Culvert CD-279.76

LJB provided Norfolk Southern Railway with a site survey, hydrologic and…
Frederick Airport Park – Phase I

Frederick Airport Park – Phase I

Frederick Airport Park Phase I added more than 515,000 square feet…