Bachelor Enlisted Quarters

LJB produced both the structural design and steel fabrication drawings for this $8 million, three-story, residential building for U.S. Air Force personnel at Charleston Air Force Base. With a combination of braced frames and moment frames supported by a driven pile foundation, the 35,000-square-foot building can withstand three-second wind gusts up to 130 mph.

It also is designed to withstand seismic activity of design category D, which is comparable to the severity of earthquakes experienced in the state of California. This facility also meets AT/FP requirements through progressive collapse avoidance. Clad with metal studs and brick veneer, the building blends well with surrounding architecture.

 

Client
The Korte Company
Location
Charleston AFB, SC

Related Projects

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…

    * required fields