Bachelor Enlisted Quarters

LJB produced both the structural design and steel fabrication drawings for this $8 million, three-story, residential building for U.S. Air Force personnel at Charleston Air Force Base. With a combination of braced frames and moment frames supported by a driven pile foundation, the 35,000-square-foot building can withstand three-second wind gusts up to 130 mph.

It also is designed to withstand seismic activity of design category D, which is comparable to the severity of earthquakes experienced in the state of California. This facility also meets AT/FP requirements through progressive collapse avoidance. Clad with metal studs and brick veneer, the building blends well with surrounding architecture.

 

Client
The Korte Company
Location
Charleston AFB, SC

Related Projects

Empire West Building 10

Empire West Building 10

LJB provided structural engineering for Empire West Building 10, a 640,000-square-foot,…
Stateview Boulevard, Buildings 1-3

Stateview Boulevard, Buildings 1-3

LJB provided structural engineering for a three-building speculative warehouse development. The…
Westside Logistics

Westside Logistics

LJB provided structural engineering for this speculative warehouse that offers more…

    * required fields