Data Systems & Technology

This office provides new space for 60 employees and accommodates future company expansion. The 20,000-square-foot, two-story office was constructed with concrete tilt-up construction. Utilizing tilt-up allows for wide open interior spaces and optimal design flexibility. Tilt-up also helped the owner of this building achieve the goal of a LEED-certified, high quality building that would incorporate current technologies and embrace future ones.

Client
SAA Architecture LLC
Location
Sierra Vista, AZ

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…