HCSS Software Office Complex – Phase 3

LJB provided structural engineering services for this two-story office building built for HCSS Software. The 58,500-square-foot office building is a two-story, V-shaped structure constructed of load bearing tilt-up concrete walls with conventional steel framing.  The architectural details were planned to be similar to the Phase 2 building in the complex, with exterior features including glass curtain wall at the front and rear entrances, as well as a large roof overhang extending over the main entrance area. Additionally, LJB provided foundation design for the adjacent three-story, 300-car precast concrete parking garage.

Client
Rosenburger Construction
Location
Sugar Land, TX

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…