This project involves the complete replacement and widening of two pairs of bridges: Interstate 90 over State Route 57 and Interstate 90 over West River Road. Traffic needed to be maintained during construction, including ramp access. LJB first performed an alternate structure study to determine the most cost-efficient layout and structure type for the new bridges. Construction of improvements to SR-57 and the I-90 ramps was ongoing during the design of the bridges. LJB coordinated with the designer, contractor and ODOT District 3 to minimize additional ramp impacts and ensure synchronization of the two projects.
Client
Ohio Department of Transportation – District 3
Ohio Department of Transportation – District 3
Location
Elyria, OH
Elyria, OH
Related State + Local Government Projects
Westside Purple Line Extension, Phase 3: Rail Transit Line
Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM
Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main
Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…




