Interstate 90 Bridge Replacements

  •  

This project involves the complete replacement and widening of two pairs of bridges: Interstate 90 over State Route 57 and Interstate 90 over West River Road. Traffic needed to be maintained during construction, including ramp access. LJB first performed an alternate structure study to determine the most cost-efficient layout and structure type for the new bridges. Construction of improvements to SR-57 and the I-90 ramps was ongoing during the design of the bridges. LJB coordinated with the designer, contractor and ODOT District 3 to minimize additional ramp impacts and ensure synchronization of the two projects.

Client
Ohio Department of Transportation – District 3
Location
Elyria, OH

Related Projects

West Airway Road Corridor Reconstruction

West Airway Road Corridor Reconstruction

On this project, LJB addressed traffic safety concerns and designed improvements…
All Aboard Florida New In-line Rail Stations

All Aboard Florida New In-line Rail Stations

LJB performed the structural engineering and shop drawing detailing for these…
McKaig Road Reconstruction, Phases 2-4

McKaig Road Reconstruction, Phases 2-4

These roadway improvement projects enhanced the safety and condition of McKaig…