This 387,000-square-foot tilt-up structure added needed space for Kraft’s Capri Sun production line. The addition includes a two-story office, a large mezzanine and a 30,000-square-foot freezer section, which utilized the Thermomass® insulation system. Tilt-up wall panels on the project reached up to 45 feet in height to meet storage requirements.
Client
The Korte Company
The Korte Company
Location
Granite City, IL
Granite City, IL
Related Commercial Projects
Montreal Airport Station, Transit Terminal for REM
Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main
Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel
Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…





