LJB completed a value engineering study for this bridge replacement project and developed a more cost-efficient solution than the precast arch culvert structure originally proposed. LJB then led the structure design as part of the design-build team that delivered this new 35-foot single-span, composite box beam bridge on integral abutments.
Client
Summit County Engineer’s Office & Mosser Construction Inc.
Summit County Engineer’s Office & Mosser Construction Inc.
Location
Akron, Ohio
Akron, Ohio
Related State + Local Government Projects
Rombach Avenue Improvements
This project implemented critical safety countermeasures and repaved a 2.19-mile section…
Winston Lake Greenway & Dredging
For this project to design improvements to Winston Lake, LJB was…
Valley Parkway Trail Connector
LJB provided design support services and environmental clearance activities for this…