Medline (Wilmer, TX)

  •  

For Medline’s new distribution center in Wilmer, Texas, LJB served as the structural engineer of record for the 800,000-square-foot cross-dock warehouse, which was constructed of a structural steel frame with concrete tilt-up wall panels. The facility includes a 20,000-square-foot cool room and was designed to accommodate automated control pick towers and conveyor belt systems.

Client
Evans General Contractors & Ware Malcomb
Location
Wilmer, Texas

Related Projects

Pipeline Relocation along IH 820

Pipeline Relocation along IH 820

Our team performed engineering and surveying services for the relocation of…
Grapeview Station Facility Expansion

Grapeview Station Facility Expansion

Prior to joining LJB Engineering, Grantham & Associates provided site civil…
Atlantic Packaging

Atlantic Packaging

LJB provided structural design of this 469,000-square-foot end-loaded build-to-suit manufacturing facility,…