Resonetics Expansion

In 2012, LJB designed a 21,000-square-foot facility to provide much needed space for a rapidly growing organization that provides laser processing services and contract manufacturing. At that time, the new building—which contained 10,000 square feet of manufacturing space, 10,000 square feet of clean room and a 1,000-square-foot office space—was specifically designed for future expansion.

Then, in 2021, LJB was once again called upon to design the expansion to the facility. The 20,000-square-foot addition generally mirrors the existing facility—built with concrete tilt-up construction and featuring the same architectural finishes to provide continuity between structures.

Client
Synergy Building Systems
Location
Dayton, OH

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…