State Route 4 Bypass Widening

The project widens the intersection of the Bypass and Port Union Road by adding additional thru lanes, dedicated right-turn lanes and double left-turn lanes; constructs an additional bridge over the CSX railroad; and modifies the intersection of the Bypass with State Route 4/Ross Road to utilize a new quadrant roadway intersection design that splits the traffic between multiple intersections, improving the flow of traffic.

The first in the state of Ohio, this quadrant roadway intersection reroutes all four left-turn movements at a four-legged intersection onto a road that connects the two intersecting roads.

Project features included structural design for a three-span rolled steel beam bridge, roadway design, traffic analysis, mast arm traffic signals, video detection, illuminated signage, noise analysis and right-of-way involvement.

Client
City of Fairfield
Location
Fairfield, OH

More Projects

Wright State Way Pedestrian Bridge over Interstate 675

Wright State Way Pedestrian Bridge over Interstate 675

This project constructed a new 500-foot pedestrian bridge over Interstate 675…
County Road 25A Phase III Reconstruction

County Road 25A Phase III Reconstruction

This project widened 3,900 feet of County Road 25A with a…