State Route 4 Bypass Widening

  •  

The project widens the intersection of the Bypass and Port Union Road by adding additional thru lanes, dedicated right-turn lanes and double left-turn lanes; constructs an additional bridge over the CSX railroad; and modifies the intersection of the Bypass with State Route 4/Ross Road to utilize a new quadrant roadway intersection design that splits the traffic between multiple intersections, improving the flow of traffic.

The first in the state of Ohio, this quadrant roadway intersection reroutes all four left-turn movements at a four-legged intersection onto a road that connects the two intersecting roads.

Project features included structural design for a three-span rolled steel beam bridge, roadway design, traffic analysis, mast arm traffic signals, video detection, illuminated signage, noise analysis and right-of-way involvement.

Client
City of Fairfield
Location
Fairfield, OH

Related Projects

Kings Island Drive Roadway & Safety Improvements

Kings Island Drive Roadway & Safety Improvements

To support increasing traffic demands, as well as the development of…
Uptown Streetscape Improvements

Uptown Streetscape Improvements

LJB is leading the Uptown Implementation Plan, which is a detailed…
Columbus County Bridge Replacement

Columbus County Bridge Replacement

LJB served as the prime consultant providing engineering services in the…