State Route 741 and Innovation Drive Traffic Signal Design

LJB designed mast arm traffic signal supports that are of a style compatible with recent signal installations along the SR741 corridor. The design included other signal related equipment and equipment for a fully functional installation.

The signal supports utilized a performance based specification that required the manufacturer to meet loading requirements of the new signal supports and stamp the approved shop drawings.

The design also included equipment to connect with the existing system along the State Route 741 corridor. Interconnect and signal controller equipment were sole sourced to be compatible with existing hardware and enable communication.

Radio interconnect was the preferred interconnect method to the existing signal system and additional plans were not required to connect the proposed traffic signal to the existing system.

Client
Montgomery County TID
Location
Miami Township, OH

More Projects

Interstate 75 Right-of-Way Plans and Acquisition for the Brent Spence Bridge Replacement

Interstate 75 Right-of-Way Plans and Acquisition for the Brent Spence Bridge Replacement

The Brent Spence Bridge carries Interstate 75 over the Ohio River…
Water Asset Management - Web GIS Implementation

Water Asset Management - Web GIS Implementation

The City of Miamisburg’s Department of Public Works needed a modern…
Bass Lake Channel Repair

Bass Lake Channel Repair

In 2016, Bass Lake overtopped the emergency spillway during the flooding…