Sunridge Building 2

As the structural engineer of record for this project, LJB prepared structural design documents for bidding, permitting and construction.

This project is a single-story, speculative, cross-docked warehouse facility that measures 715,500 square feet, with a minimum clear height of 40 feet. Loading docks and drive-in ramps are provided along the north and south walls, along with multiple storefronts at each building corner.

Client
Ware Malcomb
Location
Wilmer, Texas

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…