TJX Corporation

Despite significant site challenges and a massive footprint, this project demanded a 10-month schedule. The 1.3-million-square-foot project was built entirely with insulated tilt-up concrete wall panels.

Using a virtual army of subcontractors, an on-site batch plant and a number of other time saving methods, the aggressive schedule was met. The building features more than three miles of SuperFlat floors, 46-foot clear high-bay racking and 130 dock doors to facilitate warehousing operations.

Client
Cutler Associates
Location
Pittson Township, PA

Related Projects

Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…