LJB provided design support services and environmental clearance activities for this 10-foot, all-purpose trail connector located within the Cleveland Metroparks’ Brecksville Reservation. This connector provides pedestrian and bicycle connectivity to the existing Cleveland Metroparks. LJB provided measures that minimize harm and resulting mitigation to the protected recreational activities, features, or attributes associated with the adjacent Brecksville Reservation or Seneca Golf Course. LJB also created cross sections of the bikeway alignment and designed curb ramps at each intersection.
Client
Cleveland Metroparks
Cleveland Metroparks
Location
Brecksville, Ohio
Brecksville, Ohio
Related State + Local Government Projects
Rombach Avenue Improvements
This project implemented critical safety countermeasures and repaved a 2.19-mile section…
Winston Lake Greenway & Dredging
For this project to design improvements to Winston Lake, LJB was…
Valleyview Street & Morris Road Waterline & Stormwater Improvements
The failing storm sewer and water main were creating sinkholes and…