Winston Lake Greenway & Dredging

  •  

For this project to design improvements to Winston Lake, LJB was called upon to develop a method to remove silt and improve water quality. Instead of hauling 18,000 cubic yards of silt to a certified landfill, our team worked to coordinate and manage the removal and transport of the material to be used on a nearby city-owned property. When the lake was dredged, the materials were pumped a short distance to the site of a new golf driving range and then the material was treated with sedimentation bags to remove water. This innovative solution saved the city $200,000 in transportation and removal costs and enhanced another city project at the same time.

Client
City of Winston-Salem
Location
Winston-Salem, North Carolina

Related Projects

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…
Alaskan Way Viaduct Replacement Program

Alaskan Way Viaduct Replacement Program

Role: Cost and Risk Verification Check and Expert Review Panel Member Client:…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…