TJX Corporation

Despite significant site challenges and a massive footprint, this project demanded a 10-month schedule. The 1.3-million-square-foot project was built entirely with insulated tilt-up concrete wall panels.

Using a virtual army of subcontractors, an on-site batch plant and a number of other time saving methods, the aggressive schedule was met. The building features more than three miles of SuperFlat floors, 46-foot clear high-bay racking and 130 dock doors to facilitate warehousing operations.

Client
Cutler Associates
Location
Pittson Township, PA

Related Projects

Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…
Atlanta Airport Plane Train Turnback Tunnel

Atlanta Airport Plane Train Turnback Tunnel

Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build Client:…