LJB designed the replacement of this existing single-span slab bridge and installation of new abutments. The replacement bridge is a new 60-foot single-span prestressed concrete box beam bridge with a composite concrete deck and reinforced concrete integral abutments on pile foundations placed behind the existing ones. All work was above the ordinary high-water mark for the stream, there were two right-of-way takes, and utility relocations were required. Associated approach roadway work included pavement replacement of approximately 25 feet at each end of the bridge and guardrail upgrades.
Client
ODOT – District 4
ODOT – District 4
Location
Ravenna Township, OH
Ravenna Township, OH
Related State + Local Government Projects
Interurban Pedestrian Bridge
LJB supported Chagrin Valley Engineering, LTD (CVE) in the design and…
Hancock County Bridge Replacements
LJB designed two cast-in-place reinforced concrete slab bridges on SR 698…
Atwood Lake Peninsula Master Plan
This project for the Muskingum Watershed Conservancy District involved master planning…