Alaskan Way Viaduct Replacement Program

  •  
  • Role: Cost and Risk Verification Check and Expert Review Panel Member
  • Client: Washington State DOT
  • Construction Cost: $3.1 Billion\Technology: EPBM and Cut and Cover
  • Geology:  Soft Ground
  • Dimensions: 58 ft (17.6 m)
  • Length: 9600 ft (2.9 km)
  • Depth: 20-50 ft (6-15 m)
Project Elements:

  • Single-tube double-deck tunnel
  • Two lane highways on each level with 50 mph design speed
  • Cost and budget verification panel (3 people) prior to bidding project
  • Expert Review Panel – annual report to state legislature and Governor’s office
  • Cost and risk profile of project
  • Status with respect to budget and schedule
Client
Washington State DOT
Location
Seattle, WA

Related Projects

RELLIS Data Center

RELLIS Data Center

At Texas A&M University’s RELLIS Campus, LJB delivered full structural design…
University of Maine Farmington

University of Maine Farmington

Our team provided site design, traffic and parking studies, and permitting…
Mount Ararat High School

Mount Ararat High School

Our team partnered with PDT Architects to redevelop Mt. Ararat High…