Alaskan Way Viaduct Replacement Program

  •  
  • Role: Cost and Risk Verification Check and Expert Review Panel Member
  • Client: Washington State DOT
  • Construction Cost: $3.1 Billion\Technology: EPBM and Cut and Cover
  • Geology:  Soft Ground
  • Dimensions: 58 ft (17.6 m)
  • Length: 9600 ft (2.9 km)
  • Depth: 20-50 ft (6-15 m)
Project Elements:

  • Single-tube double-deck tunnel
  • Two lane highways on each level with 50 mph design speed
  • Cost and budget verification panel (3 people) prior to bidding project
  • Expert Review Panel – annual report to state legislature and Governor’s office
  • Cost and risk profile of project
  • Status with respect to budget and schedule
Client
Washington State DOT
Location
Seattle, WA

Related Projects

Mercy Hospital (Northern Light Health)

Mercy Hospital (Northern Light Health)

Since 2001, Gorrill Palmer (and LJB Engineering Company) has been a…
Kings Island Drive Roadway & Safety Improvements

Kings Island Drive Roadway & Safety Improvements

To support increasing traffic demands, as well as the development of…
Fall Protection for Critical Care Building

Fall Protection for Critical Care Building

LJB served as the fall protection consultant for this new 650,000-square-foot…