Central Avenue/East Dixie Drive Signal System Replacement

  •  

LJB replaced and upgraded the traffic signal system and installed ADA compliant pedestrian curb ramps at seven intersections in downtown West Carrollton.

LJB conducted manual traffic counts to obtain accurate current data, and completed a full evaluation at each intersection, including signal warrant analysis, capacity analysis, clearance interval calculations and system analysis, and a field evaluation of all equipment at the intersections.

As a result of this analysis, LJB designed a WiMax commercial mesh radio interconnect system that connected the intersections to the city’s existing central system and the recently reconfigured interchange at Exit 47 on Interstate 75. Detailed signal plans included extensive reuse of existing equipment to control costs.

LJB also performed a detailed survey of each of the intersections to identify the locations of existing signal equipment, utility facilities, edges of pavement, curb and curb ramps, sidewalk, and property pins.

Client
City of West Carrollton
Location
West Carrollton, OH

Related Projects

Morrison Bridge Rehabilitation

Morrison Bridge Rehabilitation

In 1874, the Morrison brothers built a cast-and-wrought-iron bowstring arch bridge…
Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…