Temple Dor Dorim

Tilt-up construction delivered attractiveness, functionality and flexibility for this religious, educational and social venue. A unique roof dome, sophisticated interior design and clerestory window openings provide a distinctive environment.

This project is an addition to an existing facility. Tilt-up panels taller than the original structure were used to create a windowed octagonal atrium that gave the one-story building new dimensional appeal from the outside. In order to give pass-through access to the atrium, every second panel was mounted atop the two panels adjacent to it. The addition also included a social hall with a kitchen.

The tilt-up wall panels were designed with provisions for future openings to accommodate additional growth.

Client
Miller Construction Company
Location
Weston, FL
Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…