Husky Parking Lot Improvements

LJB performed evaluations and improvements on six parking lots at Husky Energy Corporation. LJB’s team conducted evaluations of traffic control, pavement markings, and southbound traffic prior to improvement design. Improvements were made to parking lot pavement surface and markings, signage, safety of parking lots, and parking lot layout. The project is ongoing, with one of the six parking lots constructed so far.  The other five are under design.

Client
Husky Energy Corporation
Location
Lima, OH
Westside Purple Line Extension, Phase 3: Rail Transit Line

Westside Purple Line Extension, Phase 3: Rail Transit Line

Role: Tunnel Design Lead; Design Build for Contractor Client: STV Inc. Construction…
Montreal Airport Station, Transit Terminal for REM

Montreal Airport Station, Transit Terminal for REM

Role: Tunnel, Shaft and Station cavern Design – Precast Concrete Liners, Connections…
Rebecca Trunk Wastewater Main

Rebecca Trunk Wastewater Main

Role: Microtunnel Designer & Construction Inspection/Administration Client: Cole Engineering Construction Cost: $43…