Atlanta Airport Plane Train Turnback Tunnel

  •  
  • Role: Owner’s Engineer for tunnel and Access Shaft; Progressive Design Build
  • Client: Ricondo
  • Construction Cost: $140 Million
  • Technology: CSEM, Drill and Blast
  • Geology:  Soil/Rock
  • Dimensions: 22 ft (6.7 m); Tunnel bifurcation up to 48 ft (14.5 m) span
  • Length: 1780 ft (237 m)
  • Depth: 36-55 ft (11-17 m)

Project Elements:

  • (x1) Access Shaft – 36 ft ID x 56 ft deep
  • Tunnel connecting main terminal and intercontinental hotel
  • Geotecnical data review
  • 30% design drawings
  • Preparation for bidding
  • Review and approval of Contractor’s design
Client
Ricondo
Location
Atlanta, GA
Morrison Bridge Rehabilitation

Morrison Bridge Rehabilitation

In 1874, the Morrison brothers built a cast-and-wrought-iron bowstring arch bridge…
Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…