Caesar Creek Vineyards – Lake and Dam Repairs

The tranquil setting of this winery property was marred when the failure of the lake’s outlet pipe began eroding a hole in the access road. LJB worked with the property owner to make corrections to the lake and dam and to design a replacement outlet pipe for the failed existing CMP outlet pipe. Part of the solution included temporarily draining the lake’s water into a lower lake. LJB used traditional survey equipment from a boat in the lake, as well as UAS (drone) technology, to collect necessary project data.

Client
Caesar Creek Winery
Location
Xenia, Ohio

Related Projects

Yulista Redstone Gateway

Yulista Redstone Gateway

LJB provided structural engineering services for several buildings that create a…
Trinity Solar Multi-Purpose Facility

Trinity Solar Multi-Purpose Facility

LJB provided structural engineering services for this 39,000-square-foot multi-purpose building that…
One Town Center

One Town Center

LJB provided structural engineering and tilt-up panel detailing on this project…