Our team served as the prime consultant on this multimodal road and bridge project that...
Pipeline Relocation along IH 820
Our team performed engineering and surveying services for the relocation of a petroleum pipeline along...
Fish Creek Road & Dechman Drive
Our team provided surveying, engineering, bidding, and construction administration services for this $4.3 million project...
Watson Branch Single Family Phase 2
G&A was hired by Realty Capital Management as the surveyor and engineer on the 116...
Kings Island Drive Roadway & Safety Improvements
To support increasing traffic demands, as well as the development of a new, $156 million...
Pipeline Design for DART Cotton Belt Commuter Rail
Prior to joining LJB, Grantham & Associates performed pipeline design, construction surveying and as-built drawings...
Uptown Streetscape Improvements
LJB is leading the Uptown Implementation Plan, which is a detailed and comprehensive set of...
Survey
Geospatial / Survey https://youtu.be/mw4HfSq5Vfg LJB’s geospatial and survey team includes experts in data collection, reality...
Rombach Avenue Improvements
This project implemented critical safety countermeasures and repaved a 2.19-mile section of Rombach Avenue (US...
State of Ohio Computer Center (SOCC) Security Upgrades
This project provides the Department of Administrative Services (DAS) with upgraded internal and external security...
Video Storm Sewer Lines at Wright-Patterson AFB
LJB performed a video survey and condition report of storm sewer lines in the West...
L-Line Sewer Design
LJB provided permitting and design for the replacement of approximately 4,000 lineal feet of 12-inch...