Frederick Airport Park – Phase I

Frederick Airport Park Phase I added more than 515,000 square feet of industrial and logistics space to Frederick, Maryland, through the construction of two identical warehouse facilities. LJB served as the structural engineer for Buildings 2 and 3, designing the tilt-up concrete wall systems, structural steel framing, roof structures and foundations. Each 257,600-square-foot building featured a rear-loaded warehouse configuration with high clear heights, dock loading capabilities and flexible layouts suited for a wide range of industrial users. The structural design combined load-bearing tilt-up concrete panels with long-span steel framing to create durable, efficient facilities that supported accelerated construction and long-term performance.

Client
MGMA
Location
Frederick, MD

Related Projects

Morrison Bridge Rehabilitation

Morrison Bridge Rehabilitation

In 1874, the Morrison brothers built a cast-and-wrought-iron bowstring arch bridge…
Benchwood Station Transportation Improvements

Benchwood Station Transportation Improvements

LJB helped shape the future of the Benchwood Station District, Butler…
Olentangy Augmentation Relief Sewer (OARS) Construction Management

Olentangy Augmentation Relief Sewer (OARS) Construction Management

Role: Construction Management, Technical Support Client: City of Columbus Construction Cost: $375…