Frederick Airport Park Phase I added more than 515,000 square feet of industrial and logistics space to Frederick, Maryland, through the construction of two identical warehouse facilities. LJB served as the structural engineer for Buildings 2 and 3, designing the tilt-up concrete wall systems, structural steel framing, roof structures and foundations. Each 257,600-square-foot building featured a rear-loaded warehouse configuration with high clear heights, dock loading capabilities and flexible layouts suited for a wide range of industrial users. The structural design combined load-bearing tilt-up concrete panels with long-span steel framing to create durable, efficient facilities that supported accelerated construction and long-term performance.
Client
MGMA
MGMA
Location
Frederick, MD
Frederick, MD
Related Commercial Projects
Empire West Building 10
LJB provided structural engineering for Empire West Building 10, a 640,000-square-foot,…
Stateview Boulevard, Buildings 1-3
LJB provided structural engineering for a three-building speculative warehouse development. The…
Westside Logistics
LJB provided structural engineering for this speculative warehouse that offers more…









